Skip to content
EST. 2018WINNIPEG · MANITOBAMB REG. 10110182

Structurefirst.Everythingelse after.

Empire Framing builds the floor systems, walls and roof structure that every other trade on your site depends on. Residential and commercial, across Winnipeg and southern Manitoba — framed square, plumb and level, and handed over ready to build on.

Operations
WPG --:--:--
Enquiry intakeACCEPTING
AI assistantFALLBACK
Instant estimatorREADY
Plan readerSTANDBY
Lead triageMANUAL

> Answering enquiries around the clock

SEC.02/07Capability

Full framing scope,
deck to ridge.

01

Floor systems

  • Engineered I-joist
  • Open-web truss
  • Dimensional joist
  • LVL & LSL rim
  • Subfloor & adhesive
  • Cantilever framing
02

Wall framing

  • Load-bearing walls
  • Partition walls
  • Tall walls
  • Party & separation walls
  • Engineered headers
  • Post & beam
03

Roof structure

  • Truss set & brace
  • Stick-framed roofs
  • Vaulted ceilings
  • Dormers & valleys
  • Ridge beams
  • Soffit & fascia backing
04

Envelope

  • Wall sheathing
  • Roof sheathing
  • Strapping
  • Blocking & backing
  • Window & door bucks
  • Temporary weather protection
SEC.04/07Systems

A framing crew that runs on software.

Most contracts are lost in the gap between someone asking and someone answering. We closed that gap with automation, so the answer arrives while you are still on the page — then a person takes it from there.

Inspect the stack

AI assistant

Answers real framing questions 24/7 and hands your details straight to the crew.

Instant estimator

Transparent line-by-line framing ballpark, computed on the spot.

Plan reader

Upload a drawing; get the framing scope read back to you.

Auto triage

Every enquiry summarised and priority-scored the moment it lands.

SEC.05/07Standards

Held to
tolerance.

A shell that measures true saves every trade behind us time and money. These are the checks we run before we call a stage done.

Wall plumb≤ 1/4" over 8'Checked before sheathing
Floor level≤ 1/4" over 20'Crowned and shimmed
Wall layout16" or 24" O.C.Snapped to the print
OpeningsPer stamped drawingsHeaders sized to span
BracingFull temporary bracingUntil sheathing is on
HandoverWalked against drawingsDeficiencies corrected
SEC.06/07Sequence

First call to
framed shell

  1. 01

    Tell us about the build

    Call, send the drawings, or talk to the AI assistant on this site at any hour. It asks the same qualifying questions we would and records the answers.

  2. 02

    Automated triage

    Every enquiry is summarised and priority-scored the moment it lands, so nothing sits in an inbox over a weekend and urgent starts surface first.

  3. 03

    Scope and ballpark

    The estimator on this site returns an instant ballpark from your dimensions. We follow it with a real reviewed number once we have read the drawings.

  4. 04

    Schedule and crew

    We confirm the start window and put a framer-carpenter crew on it, sequenced around the rest of your trades.

  5. 05

    Frame it

    Floor system, walls, roof structure, sheathing. Built square, plumb and level, braced and ready for the next trade.

  6. 06

    Walk it and hand over

    We walk the shell with you against the drawings, correct anything flagged, and hand off a structure that clears inspection.

SEC.07/07Coverage

Winnipeg
and out.

We run out of Sunnyside and build right across the Winnipeg region. If your site is outside the ring, call anyway — you will get a straight answer on whether we can reach it.

Winnipeg
Springfield
West St. Paul
East St. Paul
Headingley
Oak Bluff
Lorette
Niverville
WINNIPEGWEST ST. PAULEAST ST. PAULSUNNYSIDESPRINGFIELDLORETTENIVERVILLEOAK BLUFFHEADINGLEYOUR YARDHUBSERVICEDN

Got drawings?
Let’s frame it.

Send what you have and we come back with a real number. Or get a ballpark in the next sixty seconds.